Thursday, 1 September 2011

New Infrastructure Concept Development

Infrastructure Developing Bubble Diagram:
Group of people who use infrastructure in Canberra 
Users | -Government Staff
           -Tourism
           -Invited Guest

Infrastructure system consideration| -Transportation System
                                                  -Communication System
                                                  -Green Energy System
                                                  -Waste System


We proposed the new transportation base on original route. we changed the outer circle route as the main two way traffic route to connect various direction around circle and inner circle is boundary of Parliament House, not means to disconnect with outside. it is designed  about people driving the private vehicles park in designed parking spot, then plug in power energy transmission  machines to supply powers to Parliament House. Only green vehicles(parliament house will provided) can access(e.g. Buggy).


This design benefit  are:
-Clean energy re-generation
-Re-organised urban layout
-More efficient traffic flow


The benefit of sky bridge are:
-Improve inner working efficiency between departments.
-Distributed departments around parliament house.








Stack Transportation Diagram





Distributed Technology Communication System

Benefit are:
-Education Residence
-Interaction Between People
-Survey Information Back to Parliament Stratege Departments
-Response
-Political Transparency



Clean Energy Generation System
-Distributed Power Transmission Stations
-Waste Vacuum Recycling System






Proposed New Infrastructure Applied On Parliament House
3 layers to show the functionalities



No comments:

Post a Comment